the Courtyard

DRAWINGS
EACH BUILDING AT THE COURTYARD WAS ORIGINALLY IDENTIFIED BY A LETTER, AS SHOWN ON DRAWINGS, RATHER THAN THE NUMBERS NOW IN USE. PLEASE USE THE FOLLOWING CONVERSION TABLE.

Drawing

Revision

Description

Scale

Download

9901 / 1

X

Site Plan (including ground floors)

Site Plan (including ground floors)

1:200

2

F

Roof plans

Roof plans

1:200

3

Q

Elevations of Units E to L (indicative only)

Elevations of Units E to L (indicative only)

1:100

4

K

Elevations of Units A, B, C & D (indicative only)

Elevations of Units A, B, C & D (indicative only)

1:100

5

N

Ground floor plan of Units A & B

Ground floor plan of Units A & B

1:50

6

N

Ground floor plan of Units C & D

Ground floor plan of Units C & D

1:50

7

P

Ground floor plan of Units E, F & G

Ground floor plan of Units E, F & G

1:50

8

Q

Ground floor plan of Units H, I & J

Ground floor plan of Units H, I & J

1:50

9

I

Ground floor plan of Units K & L

Ground floor plan of Units K & L

1:50

10

F

First floor plan of Units A & B

First floor plan of Units A & B

1:50

11

H

First floor plans of Units C & D

First floor plans of Units C & D

1:50

12

G

First floor plan of Units E F & G

First floor plan of Units E F & G

1:50

13

F

First floor plan of Units H I & J

First floor plan of Units H I & J

1:50

15

D

Floor finishes: ground floor

1:100 & 1:2

16

C

Floor finishes: first floor

1:100

17

E

Reflected ceiling plans: ground floor

1:100

18

C

Reflected ceiling plans: first floor

1:100

19

F

Enclosure for electrics sub-station and refuse

1:50

20

D

Sections

Sections

1:50

21

F

Elevations Units A & B

Elevations Units A & B

1:50

22

D

Elevations Unit C

Elevations Unit C

1:50

23

D

Elevations Unit D

Elevations Unit D

1:50

24

C

South elevations Units E, F, G, H & I: South East elevation I & J

South elevations Units E, F, G, H & I: South East elevation I & J

1:50

25

C

North elevations Units E, F, G, H & I: Gable elevations E & L

North elevations Units E, F, G, H & I: Gable elevations E & L

1:50

26

C

East & West elevations Units J K & L

East & West elevations Units J K & L

1:50

27

B

Elevations of windows and single fire exit

Elevations of windows and single fire exit

1:10 & 1:5

28

A

Elevations of fire exit doors, glass blocks, and louvres

1:10

29

C

Elevation of air brick & cavity tray, section through perimeter wall & ground beam indicating cranked vent

1:5

30

D

Vertical section through perimeter wall & ground beam

1:5

31

D

Sections through perimeter wall showing fire exit threshold and meter housing

Full Size & 1:5

32

D

Vertical section through internal 215mm brick wall at ground level

1:5

33

B

Vertical section through party wall at first floor level & vertical section through perimeter wall at first floor level

1:5

34

E

Vertical section through party wall at ground level

1:5

35

n/a

Plans of Units A,B & J: Fire Strategy

1:50

Not Available

36

n/a

Plans of Units C & D: Fire Strategy

1:50

Not Available

37

n/a

Plans of Units E,F,G,H & I: Fire Strategy

1:50

Not Available

38

n/a

Plans of Units K & L: Fire Strategy

1:50

Not Available

39

G

Horizontal section through shopfront and plans

Full Size & 1:20

40

D

Horizontal section through window and louvres

Full Size

41

E

Horizontal section through glass blocks

Full Size

42

D

Vertical section through cill and meter box

Full Size

43

E

Vertical section through ground floor window head

Full Size

44

F

Vertical section through low level louvres

Full Size

45

G

Vertical section through glass blocks

Full Size

46

G

Vertical section through high level louvres in gable

Full Size

47

-

Typical door frames

Full Size

48

-

Handrail layouts

1:20 & 1:50

49

A

Handrail details

1:5

50

E

Typical section at eaves and window head

Full Size & 1:5

51

E

Typical sections through roof with steel structure

1:5

52

C

Typical sections through ridge and purlins: Units with glulams

1:5

53

C

Section through roof at party wall and verge: Units with glulams

1:5

54

C

Section through lead valley gutter: Units I & J

1:5

55

E

Sections and plan of Unit I core (Unit J handed)

1:20

55

E

Sections and plan of Unit I core (Unit J handed)

1:20

56

A

First floor service cores: Units C & L

1:20

57

B

First floor service cores: Units B & D

1:20

58

C

Plans and sections of Unit I core (Unit J handed)

1:20

59

D

Service cores in small units, and ground floor cores in large units

1:20

60

D

Vertical section through louvre

Full Size

61

C

Typical section through lead canopy: Units F, G, H & K

1:5

62

A

Typical side elevation of lead canopy: Units F, G, H & K

1:5

63

A

Typical front elevation (part) to lead canopy: Units F,G,H & K

1:5

64

A

Typical lead canopy roof plan, front fascia elevation and details

Full Size & 1:10

65

A

Typical section (part) through lead canopy: Units F,G,H & K

1:5

66

A

Typical plan of junction between compartment (party) wall and external wall

Full Size

67

B

Entrance threshold

Full Size & 1:10

68

B

Typical details of lead secret gutter

1:5

69

C

Section through shopfront lintol on Units F,G,H & K

Full Size 1:5, 1:20

70

D

Location of electrical fittings

1:20 & 1:50

71

A

Lintol above shopfronts on Units B,C,D & L

Full Size

72

B

Typical section through Velux window

1:5

73

B

Typical plan section through lead canopy side cheeks

Full Size & 1:5

74

n/a

Typical cross section through Velux window

Full Size & 1:5

75

C

Hard landscaping: Units E to K

1:50

76

B

Hard Landscaping: Unit C

1:50

77

C

Hard Landscaping: Unit C

1:50

78

B

Reflected ceiling plans of ground floor cores on larger units

1:20

79

-

Typical louvre doors and frames

1:5 & Full Size

80

B

Section through eaves at window head

Full Size

81

A

Section through ring beam

Full Size

82

-

Telecoms layout

1:200

83

B

Hard Landscaping: Unit D

1:50

84

A

Shopfront cill

Full Size & 1:5

85

A

Entrance signs

Full Size, 1:5, 1:10

86

A

Front wall to toilets: Units I & J

Full Size

87

-

First floor patent glazing

Full Size 1:20

88

B

Shopfronts

1:20

89

-

Roadmarkings

1:200

Site services

Site Services Sections 1

1:150

Site Services Sections 2

1:150

Site Services Sections 3

1:150

Site Services Units 1 to 6

1:150

Site Services Units 1, 11 & 12

1:150

Site Services Units 4 to 8

1:150

Site Services Units 9, 11 & 12

1:150

Site Services Landlord's Water

1:150

Site Services Landlord's Water

1:150

Lighting

Lighting Unit 1 first floor

1:50

Lighting unit 1 ground floor

1:50

Lighting unit 2 & 5 first floor

1:50

Lighting unit 3 first floor

1:50

Lighting unit 3 ground floor

1:50

Lighting unit 4 first floor

1:50

Lighting unit 4 ground floor

1:50

Lighting unit 6 & 7 first floor

1:50

Lighting unit 6 & 7 ground floor

1:50

Lighting unit 8 & 10 first floor

1:50

Lighting unit 8 & 10 ground floor

1:50

Lighting unit 9 first floor

1:50

Lighting unit 9 ground floor

1:50

Lighting unit 11 first floor

1:50

Lighting unit 11 ground floor

1:50

Lighting unit 12 first floor

1:50

Lighting unit 12 ground floor

1:50

Site Services Landlord's Water

1:150

Electrical services

Electrical services unit 1

1:50

Electrical services unit 2

1:50

Electrical services unit 3

1:50

Electrical services unit 4

1:50

Electrical services unit 5

1:50

Electrical services unit 6

1:50

Electrical services unit 7

1:50

Electrical services unit 8

1:50

Electrical services unit 9

1:50

Electrical services unit 10

1:50

Electrical services unit 11

1:50

Electrical services unit 12

1:50

Site Services Landlord's Water

1:150

Plumbing services

Plumbing unit 1 first floor

1:50

Plumbing unit 1 ground floor

1:50

Plumbing units 2 & 5 first floor

1:50

Plumbing units 2 & 5 ground floor

1:50

Plumbing unit 3 first floor

1:50

Plumbing unit 3 ground floor

1:50

Plumbing unit 4 first floor

1:50

Plumbing unit 4 ground floor

1:50

Plumbing units 6 & 7 first floor

1:50

Plumbing units 6 & 7 ground floor

1:50

Plumbing units 8 & 10 first floor

1:50

Plumbing units 8 & 10 ground floor

1:50

Plumbing unit 9 first floor

1:50

Plumbing unit 9 ground floor

1:50

Plumbing unit 11 first floor

1:50

Plumbing unit 11 ground floor

1:50

Plumbing unit 12 first floor

1:50

Plumbing unit 12 ground floor

1:50

Call directly

020 7387 4521

or send a message